Feb. 12, 2013
Metso to supply wood biomass power plant to Bioenergeticheskaya Kompaniya in Russia
HELSINKI, FINLAND, Feb. 12, 2013 (Market Wire) - Metso will supply Bioenergeticheskaya Kompaniya LLC with a complete biomass-fired combined heat and power plant in Syktyvkar, the Komi Republic, Russia. The power plant is scheduled to be in operation in 2014. The value of the order will not be disclosed.
Metso's delivery will include process equipment and technical advisory services for installation, commissioning and training. A Metso belt dryer and a Metso DNA automation system will also be included in the delivery. The power plant will utilize bark and wood residues from the Syktyvkar sawmill and other biomass. The power output of the plant will be 4 MWe. The power will be distributed to the local grid and heat will be utilized in the belt dryer.
News Service subscribers - click here to read the full article.
Not a subscriber?